The Paperwork The Trade Actually Has To Get Right.
Contract #2291
A Missing Clause Doesn't Show Up Until Someone Contests The Contract.
Every state has its own rules on what a home-improvement contract must include — a cancellation notice, the right governing-law language, how e-signature consent gets recorded. Get one wrong and it doesn’t surface until it’s tested. Structural compliance is the same story: a pier that’s under spec on torque or depth is a problem whether or not anyone caught it on site.
The Legal Center handles the paperwork automatically; pier-log thresholds catch the structural side.
The short version
Nine Things It Handles. .
Legal Center
Contract templates, proposal sections, the document library and document templates, all in one place.
ESIGN Consent
Every e-signature captured with the signer's IP address and device — recorded proof, not a checkbox. See contracts.
Notice of Cancellation
Attached to every contract by default, with the transaction date and the 3-business-day cancellation deadline filled in.
Governing Law By State
The contract's governing-law clause matches the job's state, automatically — not copy-pasted from the last one.
Tax Prep
Job and revenue records organized in a form ready to hand to your accountant.
Pier-Log Compliance
Every pier's torque and depth checked automatically against published spec. See field operations.
Expiration Reminders
A reminder fires before a license or insurance policy expires — not after it already has.
Contractor License Number
Lives on the business profile and prints on every contract and proposal automatically.
Affidavit & Disclosure Sections
Required affidavit and disclosure language is built into the contract PDF, not a separate form to track down.
Proof, Not Just A Signature.
- Every e-signature is captured with IP address and device, automatically.
- The Notice of Cancellation is attached to every contract by default, with the transaction date and the 3-business-day cancellation deadline filled in.
- Governing law follows the job's state, not a template that never gets updated.
- Records land pre-organized for tax prep — no year-end scramble.
Consent Record
Torque And Depth, Checked Against Spec — Not Someone's Memory.
Every pier logged in the field gets checked against published compliance minimums the moment it’s entered. A pier under spec on either measurement gets flagged, not buried in a paper log.
- Torque and depth checked against published spec, automatically.
- A pier under either threshold is flagged for review — not silently logged.
- Compliance minimums are published, not a judgment call in the field.
Compliance That Follows The Job's State.
Multi-State, No Manual Tracking
Governing law and cancellation notices follow the job's state automatically, wherever you operate.
Every Signature Is Provable
ESIGN consent records are there if a contract is ever contested — not just assumed.
Structural Compliance, Not Just Paperwork
Pier thresholds are checked the same way the contract clauses are — automatically, every time.