INDUSTRIES · SEISMIC, WIND, AND STRUCTURAL RETROFIT

Software For Crews Who Tie Houses Down, And Can Prove It.

From the first assessment to the signed contract, the photos of every bolt, brace, and tie-down, and the warranty, run every retrofit job in one platform built for work that finish materials cover up.
Job #8021 · Foundation Bolting and Bracing
In Production
27 Harbor St · Anchor bolts · Cripple wall bracing · Tie-downs
Estimate #8021
Signed
Work order
4 of 7 steps done
Anchor bolt photo
Required
WHO IT'S FOR

Built For Every Kind Of Retrofit Work.

Seismic, wind, and load path retrofits are specified before they are built, then closed up behind drywall and siding. The job runs on the same record: inspection, estimate, contract, work order, photos, and warranty.
Seismic retrofit contractors
Foundation bolting
Cripple wall bracing
Structural reinforcement
Wind mitigation reinforcement
Hurricane tie-down retrofitting
Load path reinforcement
WHERE RETROFIT JOBS BREAK DOWN

Retrofit Work Gets Covered. The Record Has To Stay.

A retrofit is only as good as its details: bolt spacing, brace placement, and every connection from the roof to the foundation. Once the work is closed up or the crawl space is shut, nobody can see whether it was done to spec.

When an insurer, an inspector, or a buyer asks what was installed, the job record is the only answer.

 

THE SHORT VERSION

One record carries the findings, the estimate, the signed contract, the crew’s checklist with required photos, and the warranty that follows.
WHAT GOES WRONG, AND WHAT FIXES IT

Six Problems Retrofit Crews Know Well.

1

Details nobody can check later

Bolts, braces, and ties are hidden behind sheathing or finish work.

Required-photo steps won't mark complete without one attached.

2

The assessment lives in a notebook

Weak points and the recommended retrofit get summarized instead of recorded.

Inspection findings captured and shared with the homeowner.

3

The spec doesn't reach the crew

Spacing, hardware, and brace locations get relayed by phone.

Work orders carry the written task list to the crew's phone.

4

Multi-part scopes priced by hand

Bolting, bracing, and tie-downs quoted from memory.

Branded estimates built and signed in minutes.

5

Proof needed long after the job

Insurers, inspectors, and buyers ask for documentation years later.

Warranties and job records stay searchable against the job.

6

Crawl spaces with no signal

The crew is under the house with no bars.


Logs and photos save on the phone and sync later.

PROOF OF WHAT NOBODY ELSE WILL SEE

Photos Of The Work Behind The Access Door.

Foundation bolting, cripple wall bracing, or hurricane tie-downs: write the steps once, flag the ones that need proof, and the crew can’t skip them.
Foundation Bolting and Bracing · Job #8021
Synced
Work order checklist · R. Castillo crew
☑ Mark bolt and brace locations
☑ Drill and set anchor bolts
📷 Attached
☑ Install cripple wall bracing
📷 Attached
☐ Install tie-down hardware
📷 Required
☐ Final photos and sign-off
Next step needs a photo before it can close
📷 Photo required
A RETROFIT JOB, START TO FINISH

One Record From Assessment To Warranty.

Step 1

Inspect

Weak points captured and shared with the homeowner.

Step 2

Estimate

A branded estimate built and signed in minutes.

Step 3

Contract

E-signed with proof and the cancellation notice attached.

Step 4

Install

Work order and photos run on the crew's phone.

Step 5

Warranty

The warranty is logged against the job and searchable.

FOR EVERY RETROFIT SCOPE

Seismic, Wind, And Load Path Reinforcement.

Seismic and wind retrofits vary by region and by house. Your estimates, work orders, and warranties follow the work you actually sell.

 
WHAT OBLYSS HANDLES FOR RETROFIT CREWS
Jobs and pipeline
First call to final payment
Inspection reports
Findings shared
Estimates and contracts
Signed with proof
Work orders
Required-photo steps
Technician app
Opens in the phone's browser
Customer timeline
Calls, texts, emails
Warranties
Logged and searchable
QUESTIONS RETROFIT CREWS ASK

Frequently Asked Questions

How do crews prove bolts and braces were installed?
Steps can require a photo, and a required-photo step stays open until one is attached. The proof is on the job record before the work is closed up.
Yes. Checklists and photos save on the phone and sync as soon as signal returns.

No. It runs in the phone’s browser. Open app.oblysspro.com, add it to the home screen, and it opens like an app. See the Technician App.

Yes. Contracts are sent, signed, and tracked with no printing, with signature proof and the Notice of Cancellation attached. See Contracts.

Yes. Retrofit and structural jobs run on the same record, with the same estimates, work orders, and warranties. See the structural repair page.

Put The Whole Retrofit Job On One Record.

Book a 30-minute demo and watch a job go from assessment to photo proof to warranty.