Foundation Repair Field Operations

The pier you installed today is evidence three years from now.

A homeowner sells the house. An insurer wants proof. A lawyer asks what you actually did. On a foundation job, the work is buried in the ground the day after you finish, and the only thing left is your documentation. OblyssPro captures it while the crew is on site: every pier, every elevation, every torque reading, checked against spec and saved to the job forever.
Ten foundation-specific modules. Logged on the phone in the field, not re-typed at the office that night.
Pier Installation Log · Job #4471
Pier Type Depth Torque Status
P-01 Helical 21 ft 3,400 ft·lb Pass
P-02 Helical 23 ft 3,600 ft·lb Pass
P-03 Push 26 ft n/a Pass
P-04 Helical 18 ft 2,650 ft·lb Review
P-05 Helical 22 ft 3,500 ft·lb Pass
9 / 10 piers pass 1 flagged for review · torque below range
Why field documentation is the whole game

The best repair in the world is worth nothing you can prove.

Foundation work is the rare trade where the finished product disappears. The piers go under the slab. The lift is measured in fractions of an inch. Once the dirt goes back and the concrete cures, nobody can walk the job and see what you did. All that is left is what you wrote down.

And people ask. The homeowner asks at resale, because a buyer’s inspector wants records. The insurer asks when a claim comes in. Occasionally a lawyer asks, and that is the day a shoebox of crumpled field notes and a few blurry phone photos stops being good enough.

Most crews still capture this on paper, in a group text, or in three apps that do not talk to each other. The pier depths live in one place, the before photos in another, the warranty in a filing cabinet. Pulling it together two years later means somebody spends an afternoon reconstructing a job from memory. That is the gap this closes.

Captured once, kept forever

Every reading your crew takes lands on the job record the moment they enter it. Pier logs, elevations, crack measurements, photos, torque checks, and warranties all sit on the same job, tied to the same address and customer. When the question comes years later, the answer is already assembled. Nobody rebuilds anything.
Tier 1 · Field data collection

What the crew captures on the phone.

These five modules run on the technician app, on the same phone your crew already carries. No laptop in the truck, no re-entry at the office. If they can tap it in while they are standing on the job, it is documented.

Pier Installation Log

Log every pier as it goes in: type, depth, torque, PSI, soil type, and GPS coordinates. A quick-add form and a running table sit right on the job and on the Tech PWA, so the record builds pier by pier as the crew works.

Elevation Survey

Take pre-repair and post-repair elevation readings on a grid. The system runs the differential automatically and draws a heatmap, so the lift you achieved is a picture anyone can read, not a column of numbers.

Structural Movement Tracker

Measure the same cracks over time at a property. Each location gets a trend, growing, stable, or shrinking, with a directional indicator, so a monitoring customer sees exactly what their house is doing between visits.

Warranty Transfer Portal

A public lookup page and transfer request form built for property sales. A buyer or seller finds the warranty, requests the transfer, and it lands on your dashboard to review and approve. See how warranties work end to end.

Before / After Documentation

One click builds a report that puts the pre-repair and post-repair data side by side: piers, elevations, and photos, in one document. The proof of the job, assembled from what the crew already logged.

It all lands on the job

None of this is a separate app to reconcile. Every Tier 1 entry attaches to the job record, next to the estimate, contract, and schedule. See the connected job record.

Elevation Survey, up close

A quarter-inch of lift, drawn so a homeowner gets it.

You know what a two-inch differential across a living room means. Your customer does not, until they see it. The Elevation Survey turns a grid of readings into a heatmap: the low corner in red before the repair, the floor pulled back toward level after. It is the single most convincing thing you can hand a homeowner who is nervous about a five-figure decision, and the single most useful thing to hand an adjuster who was not there.

Because the pre and post readings live on the same job, the before and after are never mismatched. The differential is calculated for you. Nobody is subtracting numbers on a legal pad in the truck.

Elevation heatmap · post-repair differential
0.0
0.2
0.4
0.6
0.9
0.2
0.3
0.6
1.0
1.4
0.4
0.7
1.1
1.6
2.0
Level
Moderate drop
Settlement (in.)
Tier 2 · Intelligence & compliance

Where field data turns into proof and pattern.

Tier 1 captures the readings. Tier 2 does something with them: checks them against spec, aggregates them across your territory, and packages them for the people who ask, the engineer, the adjuster, the homeowner at resale.

Torque & Depth Compliance Checker

Validates each pier against published ICC-ES helical pier specifications: the Kt torque factor, minimum depth, and torque range. You get a pass, warning, or fail per pier and an overall compliance score for the job, so an out-of-range pier surfaces on site, not in a deposition.

Soil Condition Intelligence

Every pier log carries a soil type. Aggregate them by zip code and you get zone cards: dominant soil, average pier depth, and how many data points back it up. Over time your own jobs become a private map of what is under the ground in your territory.

Engineer Report Builder

One click assembles a structured report: property info, pier summary, elevation data, soil conditions, and compliance results, formatted and ready to download. It gives an engineer a clean, complete starting point instead of a folder of loose files.

Insurance Claim Package

Generates a complete claim package: cover sheet, structural assessment, elevation data, repair documentation, warranty certificates, and photo evidence grouped by phase, before, during, after. The adjuster gets one organized package instead of ten separate emails.

Annual Warranty Inspection Scheduler

A dashboard of every warranty with its next-due inspection date, urgency indicator, and metadata: type, pier count, repair method, and years since the repair. Annual inspections stop slipping through the cracks, which is exactly where warranty disputes come from.

Straight talk on the engineer report

The Engineer Report Builder produces engineering-grade documentation from your field data. It organizes the record. It does not replace a licensed engineer's review or stamp where your state requires one.

Torque & Depth Compliance, up close

Catch the pier that is out of spec before you backfill.

A helical pier has a relationship between installation torque and capacity. Install one that never hit the torque range or the minimum depth, and you have a pier you cannot stand behind. The problem is that you find out later, when someone with a spec sheet reviews the job.

The Compliance Checker runs that review on site. As the crew logs each pier, it checks the Kt factor, minimum depth, and torque range against published ICC-ES helical pier specifications and flags anything short. A pier that reads “review” while the machine is still on the truck is a five-minute fix. The same pier discovered in a claim two years later is a fight.

Compliance Checker · Job #4471
Pier P-02 23 ft · 3,600 ft·lb
Pass
Pier P-04 18 ft · 2,650 ft·lb
Torque below range
Kt factor min depth check
ICC-ES ref applied
Overall compliance 90%
Who this pays off for

The same record, four different days it saves you.

The resale

A buyer's inspector flags the foundation. The seller pulls the before/after report and the transferable warranty in minutes, and the deal keeps moving. Warranty management.

The claim

Storm or settlement, the insurer wants proof. The claim package goes over as one organized file: assessment, elevations, repair docs, warranties, phased photos.

The dispute

Someone questions the work. The pier log, the compliance score, and the timestamps are all on the job. You are answering from records, not memory.

The next bid

Soil Intelligence tells you what is likely under the ground on the next street over, so your estimate reflects the depth the dirt actually demands. See the full platform.

The questions owners and crews ask

Frequently asked questions

What exactly does the Torque & Depth Compliance Checker check against?
It validates each pier against published ICC-ES helical pier specifications, specifically the Kt torque factor, the minimum installation depth, and the torque range. Each pier gets a pass, warning, or fail, and the job gets an overall compliance score. It is a check against a recognized industry standard, not a pass/fail we invented.
No, and we are careful about this. The Engineer Report Builder assembles your field data, property info, pier summary, elevation readings, soil conditions, and compliance results, into structured, engineering-grade documentation. It gives a licensed engineer a clean, complete starting point, and it does not replace an engineer’s review or stamp where your state or the job requires one.
No. Tier 1 runs on the technician app, which installs on any iPhone or Android straight from the browser, no app store download. Your crew logs piers, elevations, and crack measurements on the same phone they already carry, and it works even when the crawlspace or the rural lot has no signal, syncing once they are back in service.
Instead of hunting for photos, retyping measurements, and forwarding a chain of emails, you generate one package. It includes a cover sheet, structural assessment, elevation data, repair documentation, warranty certificates, and photo evidence grouped by phase, before, during, and after. The adjuster gets an organized file, which tends to move claims faster than a pile of loose attachments.
Every pier you log records a soil type. Aggregated by zip code, that builds zone cards showing the dominant soil, the average pier depth, and how many installations back the reading. Over enough jobs it becomes your own private map of your territory, which helps you bid depth more accurately and explain to a homeowner why their neighborhood behaves the way it does.
Yes. The Warranty Transfer Portal is a public lookup page and transfer request form built for exactly that moment. A buyer or seller finds the warranty and requests the transfer, and it arrives on your dashboard to review and approve. It keeps you in control of the transfer while making the resale painless for everyone. See warranty management for the full workflow.
On the job record, alongside the estimate, contract, schedule, and photos. Anyone on your team with access to the job can pull the pier log, the elevation survey, the compliance score, or the before/after report in seconds. Six months or six years later, the history is right there. Every company’s data is fully isolated, so no other contractor can ever see yours.
It builds itself from what the crew already logged. One click on the job pulls the pre-repair and post-repair piers, elevations, and photos into a single comparison document. Because the source data was captured in the field, the office is assembling a report, not reconstructing a job.

Document the job like you will have to prove it. Because you will.

Book a 30-minute demo and watch a crew log piers, run a compliance check, and generate an engineer report and an insurance package, all from one job record.