Software For Crews Who Hold Buildings Up, And Can Prove It.
Job #5230 · Structural Stabilization
In ProductionBuilt For The Technical Side Of The Trade.
The Spec Is Precise. The Handoff Usually Isn't.
A structural job starts with findings and a specified fix: how far the wall has bowed, which beam is carrying what, where the sill plate has rotted. By the time it reaches the crew, that precision is often a verbal brief and a few photos on someone’s phone.
When the work is hidden behind finish materials, the record is the only proof of what was installed.
THE SHORT VERSION
Six Problems Structural Crews Know Well.
Findings described, not documented
A bowed wall or a sagging floor gets summarized instead of recorded with detail. Inspection findings captured and shared with the homeowner.
The specified fix doesn't reach the crew
Anchor spacing, bracing, and beam details get relayed by phone. Work orders carry the written task list to the crew's phone.
Hidden work nobody photographed
Framing, sill plates, and anchors get covered by finish work. Required-photo steps won't mark complete without one attached.
Multi-part scopes priced by hand
Anchors, carbon fiber, beams, and framing, quoted from memory. Branded estimates built and signed in minutes.
Large contracts that need to hold up
High-value technical scopes are the ones most likely to be contested. Contracts are sent, signed, and tracked with no printing.
Long-term warranties lost over time
Structural warranties outlast the file cabinet they were stored in. Warranties are logged against the job and searchable.
The Finding, The Fix, And The Proof, On One Record.
- Findings captured with photos and shared with the homeowner.
- The same record feeds the estimate and the crew's work order.
- A required-photo step stays open until a photo is attached.
- Works on site with no signal and syncs later.
Inspection Findings · Job #5230
Structural inspection · 3 findings documented
One Record From Findings To Warranty.
The job never leaves the platform, so nothing has to be re-keyed, re-checked or argued about later.
Walls, Floors, Beams, And Retrofits.
- Wall, floor, and framing jobs on the same platform.
- Multiple crews and branches, each seeing only what they need.
- Warranty records ready for the long term.