INDUSTRIES · STRUCTURAL REPAIR AND STABILIZATION
Software For Crews Who Hold Buildings Up, And Can Prove It.
From the first inspection to the signed contract, the photos of every anchor and brace, and the warranty, run every structural repair job on one record.
See It On A Structural Job
Who It’s For
Job #5230 · Structural Stabilization
In Production
31 Orchard Rd · Bowed wall · Floor joists · Sill plate
Inspection findings
3 documented
Estimate #5230
Signed
Wall anchor photo
Required
WHO IT’S FOR
Built For The Technical Side Of The Trade.
Wall stabilization, framing, beams, and retrofits get specified before they get built. The job runs on the same record: inspection, estimate, contract, work order, photos, and warranty.
Structural repair contractors
Residential structural repair
Structural stabilization
Bowed wall repair
Basement wall stabilization
Wall anchor systems
Carbon fiber wall reinforcement
Steel I-beam wall bracing
Tieback anchor installation
Load-bearing wall repair
Beam replacement
Floor joist repair
Sill plate repair
Girder repair
Column replacement
Sagging floor repair
Floor leveling
Structural framing repair
Structural masonry repair
Wood rot structural repair
Earthquake and seismic retrofit contractors (region dependent)
WHERE STRUCTURAL JOBS BREAK DOWN
The Spec Is Precise. The Handoff Usually Isn’t.
A structural job starts with findings and a specified fix: how far the wall has bowed, which beam is carrying what, where the sill plate has rotted. By the time it reaches the crew, that precision is often a verbal brief and a few photos on someone’s phone.
When the work is hidden behind finish materials, the record is the only proof of what was installed.
THE SHORT VERSION
One record carries the documented findings, the estimate, the signed contract, the crew’s checklist with required photos, and the warranty that follows.
WHAT GOES WRONG, AND WHAT FIXES IT
Six Problems Structural Crews Know Well.
1
Findings described, not documented
A bowed wall or a sagging floor gets summarized instead of recorded with detail.
Inspection findings captured and shared with the homeowner.
2
The specified fix doesn’t reach the crew
Anchor spacing, bracing, and beam details get relayed by phone.
Work orders carry the written task list to the crew’s phone.
3
Hidden work nobody photographed
Framing, sill plates, and anchors get covered by finish work.
Required-photo steps won’t mark complete without one attached.
4
Multi-part scopes priced by hand
Anchors, carbon fiber, beams, and framing, quoted from memory.
Branded estimates built and signed in minutes.
5
Large contracts that need to hold up
High-value technical scopes are the ones most likely to be contested.
Contracts are sent, signed, and tracked with no printing.
6
Long-term warranties lost over time
Structural warranties outlast the file cabinet they were stored in.
Warranties are logged against the job and searchable.
DOCUMENTED BEFORE IT IS BUILT
The Finding, The Fix, And The Proof, On One Record.
Whether it is wall anchors, carbon fiber, an I-beam brace, or a beam replacement, the inspection findings flow into the estimate, the work order, and the photos that prove it was done.
-
Findings captured with photos and shared with the homeowner. -
The same record feeds the estimate and the crew’s work order. -
A required-photo step stays open until a photo is attached. -
Works on site with no signal and syncs later.
Inspection Findings · Job #5230
Synced
Structural inspection · 3 findings documented
Bowed wall, north · 1.5 in
Attached
Sill plate rot, east
Attached
Floor joist sag, center span
Required
Recommended: wall anchors, sister joists
One finding still needs a photo · Photo required
A STRUCTURAL JOB, START TO FINISH
One Record From Findings To Warranty.
The job never leaves the platform, so nothing has to be re-keyed, re-checked or argued about later.
Step 1
Inspect
Structural findings captured and shared with the homeowner.
Inspection Reports
Step 2
Estimate
A branded estimate built and signed in minutes.
See Estimates
Step 3
Contract
E-signed with proof and the cancellation notice attached.
See Contracts
Step 4
Install
Work order and photos run on the crew’s phone.
See Work Orders
Step 5
Warranty
The warranty is logged against the job and searchable.
See Warranties
FOR EVERY STRUCTURAL SCOPE
Walls, Floors, Beams, And Retrofits.
Wall stabilization, framing repair, and retrofits are scoped and documented differently. Your estimates, work orders, and warranties follow the work you actually sell.
-
Wall, floor, and framing jobs on the same platform. -
Multiple crews and branches, each seeing only what they need. -
Warranty records ready for the long term.
WHAT OBLYSS HANDLES FOR STRUCTURAL REPAIR CREWS
Jobs and pipeline
First call to final payment
Inspection reports
Findings shared
Estimates and contracts
Signed with proof
Work orders
Required-photo steps
Technician app
Opens in the phone’s browser
Customer timeline
Calls, texts, emails
Warranties
Logged and searchable